{"id":23242,"date":"2023-11-10T13:14:00","date_gmt":"2023-11-10T13:14:00","guid":{"rendered":"https:\/\/www.prnasia.com\/story\/archive\/4263742_AE63742_0"},"modified":"2023-11-10T13:14:00","modified_gmt":"2023-11-10T13:14:00","slug":"construction-of-the-jakarta-bandung-high-speed-railway-required-overcoming-world-level-challenges-with-myriad-technological-breakthroughs","status":"publish","type":"post","link":"https:\/\/transmediavictoria.net.au\/?p=23242","title":{"rendered":"Construction of the Jakarta-Bandung High-Speed Railway required overcoming world-level challenges with myriad technological breakthroughs"},"content":{"rendered":"\n<p><b>Next-level Technology<\/b><\/p>\n<p><span class=\"xn-location\">BEIJING<\/span>, <span class=\"xn-chron\">Nov. 10, 2023<\/span> \/PRNewswire\/ &#8212; This is a report from China Report ASEAN:<\/p>\n<p>When the sun rises, high-speed trains are already lined up for departure from&nbsp;Halim Station of the Jakarta Bandung High-Speed Railway (HSR) in <span class=\"xn-location\">Indonesia<\/span>. After seven years of preparation, the first Chinese-built high-speed railway in <span class=\"xn-location\">Indonesia<\/span> and the Southeast Asian region finally set off, ending ages of anticipation. &nbsp;<\/p>\n<p>&quot;Traffic jams won&#8217;t be a problem anymore,&quot; said Dinie, a Bandung resident who works in <span class=\"xn-location\">Jakarta<\/span>. &quot;My journey home just became very easy.&quot; She celebrated the opening of the high-speed rail after years of brutal commutes. In the past, a bus&nbsp;ride could take up to seven hours if&nbsp;a traffic jam happened. Even the old train took more than three hours. The&nbsp;Jakarta-Bandung HSR cuts the trip down to a mere 40 minutes.<\/p>\n<p>Dahv, a businessman who&nbsp;frequently shuttles between <span class=\"xn-location\">Jakarta<\/span> and Bandung, pledged to share the comfortable and convenient high-speed train experience with business partners and family. &nbsp;<\/p>\n<p>Completing the 142.3 km-long&nbsp;high-speed railway required Chinese companies and Indonesian partners&nbsp;to overcome myriad world-level&nbsp;challenges to make technological breakthroughs. Construction showcased the latest achievements of Chinese high-speed rail technology. &nbsp;<\/p>\n<p><b>Challenging Project <\/b>&nbsp;<\/p>\n<p>Most of <span class=\"xn-location\">Indonesia&#8217;s<\/span> railways were built when the country was under Dutch colonial rule from the 1600s to early 1900s. When the country gained independence in 1945, the Indonesian government took over the railway facilities and made them a state-run service. However, a lack of funding and technological support left <span class=\"xn-location\">Indonesia&#8217;s<\/span> railway system lagging for decades. <span class=\"xn-person\">Ignasius Jonan<\/span>, a former&nbsp;minister of transportation, expressed concerns over slow development of <span class=\"xn-location\">Indonesia&#8217;s<\/span> railways. &quot;Personally, I think the government and Indonesian&nbsp;people have ignored trains for a long time,&quot; he said. &quot;Instead, they focused on developing road transportation.&quot;&nbsp;<\/p>\n<p>&quot;At the end of 2021, the total length&nbsp;of railways in operation&nbsp;in <span class=\"xn-location\">Indonesia<\/span> was 6,466 kilometers, only 11.4&nbsp;percent of which was electrified,&quot; said <span class=\"xn-person\">Zhang Chao<\/span>, executive director of KCIC, a <span class=\"xn-location\">China<\/span>&#8211;<span class=\"xn-location\">Indonesia<\/span> railroad joint venture. For years, only a single railway line connected <span class=\"xn-location\">Jakarta<\/span> and Bandung. Laid about a century ago, it run at a speed of only 50 km\/h. &nbsp;<\/p>\n<p>The natural environment posed a challenge for building a high&nbsp;speed railway. Java Island, where the Jakarta-Bandung HSR is located, is vulnerable to volcanic eruptions and earthquakes. The ground foundation&nbsp;in Bandung is soft, and it receives abundant rainfall and volatile weather in complicated geological conditions. To tackle these difficulties, higher&nbsp;technological standards were required.<\/p>\n<p><b>Customized Solutions <\/b>&nbsp;<\/p>\n<p>Plentiful tunnels were necessary to build a high-speed railway across mountainous Java Island. The Jakarta-Bandung HSR includes 13 tunnels with a total length of 16.69 kilometers. The N0. 2 tunnel was the most difficult&nbsp;to dig. It is 1,052 meters in length through a geologically sensitive area. The situation was complicated even further by an existing railway line and nearby mosques and residential areas. &nbsp;<\/p>\n<p><span class=\"xn-person\">Ma Jinchi<\/span>, deputy general manager and chief engineer of the Jakarta-Bandung HSR project, recalled construction of the No. 2 tunnel. The rainy season there was long. The surrounding rock featured a high liquid limit, high compression ratio, high water content, and high porosity, which meant digging was likely to cause mud outbursts and collapse. Disasters were natural when boring the tunnel. &nbsp;<\/p>\n<p>In <span class=\"xn-chron\">October 2021<\/span>, a sudden mud outburst hit. Muddy water surged and gushed out, instantly filling the tunnel. <span class=\"xn-person\">Ma Jinchi<\/span> was on site and successfully mitigated the crisis. &nbsp;Builders conducted endless surveying and measuring and experienced multiple collapses, ground surface subsidence incidents, and sudden mud outbursts. Based on early experience, the project team customized a solution for tunnel digging which combined ground grouting with in-tunnel grouting and used a double-side pilot tunnel method on the upper section. Led by <span class=\"xn-person\">Ma Jinchi<\/span>, the technical team developed three tunneling machines with utility patents. Application of the machines made the tunnel solid, stable, and more resistant to collapses. &nbsp;<\/p>\n<p>Another difficulty was construction of 56 bridges. The design team&nbsp;innovatively designed simply supported box girders for them. With the weight reduced by around 12 percent, the box girders helped make the bridges more resistant to earthquakes.<\/p>\n<p>No. 17 long-span bridge over the Citarum River, the longest on the route, is vulnerable to flooding during the wet season. Zhang Jinke, head of the project construction team, admitted that alongside geological disasters, they faced a series of difficulties like shortage of filling materials for construction of roads and other supplies. Zhang optimized the work flow and adopted new construction procedures to complete as much construction work as possible during the dry season, successfully shortening construction time from six to four months. &nbsp;<\/p>\n<p><span class=\"xn-person\">Allan Tandiono<\/span>, an <span class=\"xn-location\">Indonesia<\/span> director of KCIC, reported that more than 600 public facilities had to be relocated during the construction of the Jakarta-Bandung HSR, 300 of which involved major efforts. This posed unprecedented challenges for construction. Thanks to efficient coordination between Chinese and Indonesian managers, every problem was eventually solved. &nbsp;<\/p>\n<p><b><span class=\"xn-location\">China&#8217;s<\/span> Innovation Going Global <\/b>&nbsp;<\/p>\n<p>By slashing the journey from three hours to 40 minutes, the HSR solved intercity transportation problems affecting <span class=\"xn-location\">Jakarta<\/span> and Bandung and facilitated enhanced communication&nbsp;between the two cities. The trains serving the line are based on the key technology of the Fuxing bullet train independently developed by <span class=\"xn-location\">China<\/span> but adapted specifically for the local environment and railway conditions. Intelligent sensors and earthquake warning systems are installed in the trains, which can move as fast as 350 km\/h. <span class=\"xn-location\">Indonesia<\/span> adopted such transportation technology for the first&nbsp;time as <span class=\"xn-location\">China&#8217;s<\/span> high-speed rail took a big step towards going global. &nbsp;<\/p>\n<p>The Jakarta-Bandung HSR project was <span class=\"xn-location\">China&#8217;s<\/span> first attempt at&nbsp;bringing the whole system, every factor, and the entire industrial chain of its high-speed rails to a foreign country. &quot;Whole system&quot; means that all subsystems of the&nbsp;HSR including its roadbeds, rails, bridges, tunnels, overhead lines, communication signals, train controls, and customer service follow Chinese standards. &quot;Every factor&quot; means that the entire process from surveying and design to construction, equipment manufacturing, operation management, and commercial development is implemented in accordance with <span class=\"xn-location\">China<\/span>-made protocols. And &quot;entire industrial&nbsp;chain&quot; implies that all equipment used by the railway including&nbsp;engineering machinery, overhead&nbsp;lines, steel tracks, trains, and&nbsp;equipment for communication signals and train controls were &nbsp;manufactured by Chinese companies. These critical independently developed technologies and their corresponding commercialization demonstrate the innovation capabilities of <span class=\"xn-location\">China&#8217;s<\/span> high-speed rail system. <span class=\"xn-location\">China<\/span> tackled many world-level challenges and set new international standards for the industry.<\/p>\n<p>From follower to pacemaker, <span class=\"xn-location\">China&#8217;s<\/span> high-speed railway technology transcended industry norms by pursuing excellence. The train control system has been the&nbsp;focus of international competition&nbsp;in railway technology. <span class=\"xn-person\">Jiang Ming<\/span>, deputy chief engineer of the China Railway Signal &amp; Communication Co., Ltd., recounted the R&amp;D team&#8217;s efforts to independently develop train control systems. The team spent three years developing and testing new systems and achieved technological breakthroughs that took Western countries decades.<\/p>\n<p>The CTCS3-400T ATP on-board units, independently developed by China State Railway Group Co., Ltd., is adopted as the core control system to ensure the safety of trains moving at high speeds on the line. The units can effectively lower the probability of equipment failures and ensure safe&nbsp;and highly-efficient operation of the high-speed railway. This technology leads the world.<\/p>\n<p>The opening of the Jakarta&nbsp;Bandung HSR marks Chinese standards again going global. Via the Belt and Road Initiative, <span class=\"xn-location\">China&#8217;s<\/span> home-developed high-speed rail technologies are injecting new momentum into global infrastructure development. &nbsp;&nbsp;&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Next-level Technology BEIJING, Nov. 10, 2023 \/PRNewswire\/ &#8212; This is a report from China Report ASEAN: When the sun rises, high-speed trains are already lined up for departure from&nbsp;Halim Station of the Jakarta Bandung High-Speed Railway (HSR) in Indonesia. After seven years of preparation, the first Chinese-built high-speed railway in Indonesia and the Southeast Asian [&hellip;]<\/p>\n","protected":false},"author":8,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[20],"tags":[],"class_list":["post-23242","post","type-post","status-publish","format-standard","hentry","category-business-news"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.9 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Construction of the Jakarta-Bandung High-Speed Railway required overcoming world-level challenges with myriad technological breakthroughs - My Blog<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/transmediavictoria.net.au\/?p=23242\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Construction of the Jakarta-Bandung High-Speed Railway required overcoming world-level challenges with myriad technological breakthroughs - My Blog\" \/>\n<meta property=\"og:description\" content=\"Next-level Technology BEIJING, Nov. 10, 2023 \/PRNewswire\/ &#8212; This is a report from China Report ASEAN: When the sun rises, high-speed trains are already lined up for departure from&nbsp;Halim Station of the Jakarta Bandung High-Speed Railway (HSR) in Indonesia. After seven years of preparation, the first Chinese-built high-speed railway in Indonesia and the Southeast Asian [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/transmediavictoria.net.au\/?p=23242\" \/>\n<meta property=\"og:site_name\" content=\"My Blog\" \/>\n<meta property=\"article:published_time\" content=\"2023-11-10T13:14:00+00:00\" \/>\n<meta name=\"author\" content=\"admin_tony\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"admin_tony\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"6 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/transmediavictoria.net.au\\\/?p=23242#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/transmediavictoria.net.au\\\/?p=23242\"},\"author\":{\"name\":\"admin_tony\",\"@id\":\"https:\\\/\\\/transmediavictoria.net.au\\\/#\\\/schema\\\/person\\\/5b51d407d652c0aa802bea269ea5d7e7\"},\"headline\":\"Construction of the Jakarta-Bandung High-Speed Railway required overcoming world-level challenges with myriad technological breakthroughs\",\"datePublished\":\"2023-11-10T13:14:00+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/transmediavictoria.net.au\\\/?p=23242\"},\"wordCount\":1283,\"articleSection\":[\"Business News\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/transmediavictoria.net.au\\\/?p=23242\",\"url\":\"https:\\\/\\\/transmediavictoria.net.au\\\/?p=23242\",\"name\":\"Construction of the Jakarta-Bandung High-Speed Railway required overcoming world-level challenges with myriad technological breakthroughs - My Blog\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/transmediavictoria.net.au\\\/#website\"},\"datePublished\":\"2023-11-10T13:14:00+00:00\",\"author\":{\"@id\":\"https:\\\/\\\/transmediavictoria.net.au\\\/#\\\/schema\\\/person\\\/5b51d407d652c0aa802bea269ea5d7e7\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/transmediavictoria.net.au\\\/?p=23242#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/transmediavictoria.net.au\\\/?p=23242\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/transmediavictoria.net.au\\\/?p=23242#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/transmediavictoria.net.au\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Construction of the Jakarta-Bandung High-Speed Railway required overcoming world-level challenges with myriad technological breakthroughs\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/transmediavictoria.net.au\\\/#website\",\"url\":\"https:\\\/\\\/transmediavictoria.net.au\\\/\",\"name\":\"My Blog\",\"description\":\"My WordPress Blog\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/transmediavictoria.net.au\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/transmediavictoria.net.au\\\/#\\\/schema\\\/person\\\/5b51d407d652c0aa802bea269ea5d7e7\",\"name\":\"admin_tony\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/102836fe5f9cd6c64e96e90e7341dbc815b7d12726a85708326dc0db40afd906?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/102836fe5f9cd6c64e96e90e7341dbc815b7d12726a85708326dc0db40afd906?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/102836fe5f9cd6c64e96e90e7341dbc815b7d12726a85708326dc0db40afd906?s=96&d=mm&r=g\",\"caption\":\"admin_tony\"},\"url\":\"https:\\\/\\\/transmediavictoria.net.au\\\/?author=8\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Construction of the Jakarta-Bandung High-Speed Railway required overcoming world-level challenges with myriad technological breakthroughs - My Blog","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/transmediavictoria.net.au\/?p=23242","og_locale":"en_US","og_type":"article","og_title":"Construction of the Jakarta-Bandung High-Speed Railway required overcoming world-level challenges with myriad technological breakthroughs - My Blog","og_description":"Next-level Technology BEIJING, Nov. 10, 2023 \/PRNewswire\/ &#8212; This is a report from China Report ASEAN: When the sun rises, high-speed trains are already lined up for departure from&nbsp;Halim Station of the Jakarta Bandung High-Speed Railway (HSR) in Indonesia. After seven years of preparation, the first Chinese-built high-speed railway in Indonesia and the Southeast Asian [&hellip;]","og_url":"https:\/\/transmediavictoria.net.au\/?p=23242","og_site_name":"My Blog","article_published_time":"2023-11-10T13:14:00+00:00","author":"admin_tony","twitter_card":"summary_large_image","twitter_misc":{"Written by":"admin_tony","Est. reading time":"6 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/transmediavictoria.net.au\/?p=23242#article","isPartOf":{"@id":"https:\/\/transmediavictoria.net.au\/?p=23242"},"author":{"name":"admin_tony","@id":"https:\/\/transmediavictoria.net.au\/#\/schema\/person\/5b51d407d652c0aa802bea269ea5d7e7"},"headline":"Construction of the Jakarta-Bandung High-Speed Railway required overcoming world-level challenges with myriad technological breakthroughs","datePublished":"2023-11-10T13:14:00+00:00","mainEntityOfPage":{"@id":"https:\/\/transmediavictoria.net.au\/?p=23242"},"wordCount":1283,"articleSection":["Business News"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/transmediavictoria.net.au\/?p=23242","url":"https:\/\/transmediavictoria.net.au\/?p=23242","name":"Construction of the Jakarta-Bandung High-Speed Railway required overcoming world-level challenges with myriad technological breakthroughs - My Blog","isPartOf":{"@id":"https:\/\/transmediavictoria.net.au\/#website"},"datePublished":"2023-11-10T13:14:00+00:00","author":{"@id":"https:\/\/transmediavictoria.net.au\/#\/schema\/person\/5b51d407d652c0aa802bea269ea5d7e7"},"breadcrumb":{"@id":"https:\/\/transmediavictoria.net.au\/?p=23242#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/transmediavictoria.net.au\/?p=23242"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/transmediavictoria.net.au\/?p=23242#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/transmediavictoria.net.au\/"},{"@type":"ListItem","position":2,"name":"Construction of the Jakarta-Bandung High-Speed Railway required overcoming world-level challenges with myriad technological breakthroughs"}]},{"@type":"WebSite","@id":"https:\/\/transmediavictoria.net.au\/#website","url":"https:\/\/transmediavictoria.net.au\/","name":"My Blog","description":"My WordPress Blog","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/transmediavictoria.net.au\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/transmediavictoria.net.au\/#\/schema\/person\/5b51d407d652c0aa802bea269ea5d7e7","name":"admin_tony","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/102836fe5f9cd6c64e96e90e7341dbc815b7d12726a85708326dc0db40afd906?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/102836fe5f9cd6c64e96e90e7341dbc815b7d12726a85708326dc0db40afd906?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/102836fe5f9cd6c64e96e90e7341dbc815b7d12726a85708326dc0db40afd906?s=96&d=mm&r=g","caption":"admin_tony"},"url":"https:\/\/transmediavictoria.net.au\/?author=8"}]}},"_links":{"self":[{"href":"https:\/\/transmediavictoria.net.au\/index.php?rest_route=\/wp\/v2\/posts\/23242","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/transmediavictoria.net.au\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/transmediavictoria.net.au\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/transmediavictoria.net.au\/index.php?rest_route=\/wp\/v2\/users\/8"}],"replies":[{"embeddable":true,"href":"https:\/\/transmediavictoria.net.au\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=23242"}],"version-history":[{"count":0,"href":"https:\/\/transmediavictoria.net.au\/index.php?rest_route=\/wp\/v2\/posts\/23242\/revisions"}],"wp:attachment":[{"href":"https:\/\/transmediavictoria.net.au\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=23242"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/transmediavictoria.net.au\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=23242"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/transmediavictoria.net.au\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=23242"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}