{"id":26524,"date":"2024-05-14T06:44:00","date_gmt":"2024-05-14T06:44:00","guid":{"rendered":"https:\/\/www.prnasia.com\/story\/archive\/4413556_AE13556_0"},"modified":"2024-05-14T06:44:00","modified_gmt":"2024-05-14T06:44:00","slug":"eacon-mining-secures-new-contract-and-achieves-autonomous-fleet-deployment-in-17-days","status":"publish","type":"post","link":"https:\/\/transmediavictoria.net.au\/?p=26524","title":{"rendered":"EACON Mining Secures New Contract and Achieves Autonomous Fleet Deployment in 17 Days"},"content":{"rendered":"\n<p><span class=\"xn-location\">BEIJING<\/span>, <span class=\"xn-chron\">May 14, 2024<\/span> \/PRNewswire\/ &#8212; EACON Mining has once again demonstrated its expertise in the field of opencast coal mining with the 6<sup>th<\/sup> &nbsp;AHS contract. The latest project is the Shitoumei coal mine with reserves of 10 billion tons and an annual production capacity of over 15 million tons. Eacon Mining deployed more than 20 hybrid and diesel trucks and achieved a fully operational autonomous fleet in just 17 days.<\/p>\n<p>EACON has deployed a total of 23 autonomous mining trucks in the initial phase, which are organized into three shovel truck fleets. These fleets consist of 13 hybrid EL100 trucks with a payload of 90 tons and 10 diesel-powered trucks with a payload of 70 tons, which are used for overburden mining and coal extraction. All trucks were mobilized by EACON from other projects. Both models were equipped with EACON drive-by-wire systems and ORCASTRA\u2122 Pilot, EACON&#8217;s autonomous driving system, at the LGMG and Tonly plants.<\/p>\n<div class=\"PRN_ImbeddedAssetReference\" id=\"DivAssetPlaceHolder5077\">\n<p style=\"TEXT-ALIGN: center; WIDTH: 100%\"><a href=\"https:\/\/mma.prnasia.com\/media2\/2412069\/EL100__Hybrid_Electric_Autonomous_Haulage_Truck_in_Shitoumei.html\" target=\"_blank\" rel=\"nofollow noopener\"><img decoding=\"async\" src=\"https:\/\/mma.prnasia.com\/media2\/2412069\/EL100__Hybrid_Electric_Autonomous_Haulage_Truck_in_Shitoumei.jpg?p=medium600\" title=\"EL100, Hybrid Electric Autonomous Haulage Truck in Shitoumei\" alt=\"EL100, Hybrid Electric Autonomous Haulage Truck in Shitoumei\" \/><\/a><br \/><span>EL100, Hybrid Electric Autonomous Haulage Truck in Shitoumei<\/span><\/p>\n<\/p><\/div>\n<p>EACON has more than 250 EL100 trucks in operation, which have already covered 7.4 million kilometers autonomously. The continuous development of the turnkey AHS solution for coal mines ensures rapid deployment within remarkably short time frames. As of <span class=\"xn-chron\">March 9<\/span>, EACON has deployed the entire autonomous fleet at Shitoumei coal mine within 17 days, from initial setup to full operation, without safety drivers.<\/p>\n<p><span class=\"xn-person\">Elaine Jin<\/span>, COO of EACON Mining Australia, said: &quot;<i>In the coal mine overburden removal sector, EACON&#8217;s AHS solution has matured significantly, enabling rapid deployment in similar scenarios and significantly reducing the time and cost of implementing an autonomous haulage solution. Building on the foundation laid in coal mines, EACON will extend its AHS solution to metal mines, including gold and iron mines, in 2024.<\/i>&quot;<\/p>\n<p>Contact:<br \/>E-mail:&nbsp; <a href=\"mailto:overseas@eacon.com\" target=\"_blank\" rel=\"nofollow noopener\">overseas@eacon.com<\/a><br \/>Website: <a href=\"https:\/\/www.eacon.com\/en\/\" target=\"_blank\" rel=\"nofollow noopener\">https:\/\/www.eacon.com\/en\/<\/a>&nbsp;<\/p>\n<p><b>About&nbsp;EACON Mining<\/b><\/p>\n<p>Founded in <span class=\"xn-chron\">May 2018<\/span>, EACON is a leader in autonomous transportation solutions and new energy system development, equipping the most traditional mining industry with the most advanced technology. By combining cutting-edge autonomous driving technology with strong on-site operational capabilities, EACON provides a field-proven solution for autonomous transportation and zero-emission truck technology.<\/p>\n<div class=\"PRN_ImbeddedAssetReference\" id=\"DivAssetPlaceHolder0\"> <\/div>\n","protected":false},"excerpt":{"rendered":"<p>BEIJING, May 14, 2024 \/PRNewswire\/ &#8212; EACON Mining has once again demonstrated its expertise in the field of opencast coal mining with the 6th &nbsp;AHS contract. The latest project is the Shitoumei coal mine with reserves of 10 billion tons and an annual production capacity of over 15 million tons. Eacon Mining deployed more than [&hellip;]<\/p>\n","protected":false},"author":8,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[20],"tags":[],"class_list":["post-26524","post","type-post","status-publish","format-standard","hentry","category-business-news"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.9 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>EACON Mining Secures New Contract and Achieves Autonomous Fleet Deployment in 17 Days - My Blog<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/transmediavictoria.net.au\/?p=26524\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"EACON Mining Secures New Contract and Achieves Autonomous Fleet Deployment in 17 Days - My Blog\" \/>\n<meta property=\"og:description\" content=\"BEIJING, May 14, 2024 \/PRNewswire\/ &#8212; EACON Mining has once again demonstrated its expertise in the field of opencast coal mining with the 6th &nbsp;AHS contract. The latest project is the Shitoumei coal mine with reserves of 10 billion tons and an annual production capacity of over 15 million tons. Eacon Mining deployed more than [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/transmediavictoria.net.au\/?p=26524\" \/>\n<meta property=\"og:site_name\" content=\"My Blog\" \/>\n<meta property=\"article:published_time\" content=\"2024-05-14T06:44:00+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/mma.prnasia.com\/media2\/2412069\/EL100__Hybrid_Electric_Autonomous_Haulage_Truck_in_Shitoumei.jpg?p=medium600\" \/>\n<meta name=\"author\" content=\"admin_tony\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"admin_tony\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/transmediavictoria.net.au\\\/?p=26524#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/transmediavictoria.net.au\\\/?p=26524\"},\"author\":{\"name\":\"admin_tony\",\"@id\":\"https:\\\/\\\/transmediavictoria.net.au\\\/#\\\/schema\\\/person\\\/5b51d407d652c0aa802bea269ea5d7e7\"},\"headline\":\"EACON Mining Secures New Contract and Achieves Autonomous Fleet Deployment in 17 Days\",\"datePublished\":\"2024-05-14T06:44:00+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/transmediavictoria.net.au\\\/?p=26524\"},\"wordCount\":357,\"image\":{\"@id\":\"https:\\\/\\\/transmediavictoria.net.au\\\/?p=26524#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/mma.prnasia.com\\\/media2\\\/2412069\\\/EL100__Hybrid_Electric_Autonomous_Haulage_Truck_in_Shitoumei.jpg?p=medium600\",\"articleSection\":[\"Business News\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/transmediavictoria.net.au\\\/?p=26524\",\"url\":\"https:\\\/\\\/transmediavictoria.net.au\\\/?p=26524\",\"name\":\"EACON Mining Secures New Contract and Achieves Autonomous Fleet Deployment in 17 Days - My Blog\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/transmediavictoria.net.au\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/transmediavictoria.net.au\\\/?p=26524#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/transmediavictoria.net.au\\\/?p=26524#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/mma.prnasia.com\\\/media2\\\/2412069\\\/EL100__Hybrid_Electric_Autonomous_Haulage_Truck_in_Shitoumei.jpg?p=medium600\",\"datePublished\":\"2024-05-14T06:44:00+00:00\",\"author\":{\"@id\":\"https:\\\/\\\/transmediavictoria.net.au\\\/#\\\/schema\\\/person\\\/5b51d407d652c0aa802bea269ea5d7e7\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/transmediavictoria.net.au\\\/?p=26524#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/transmediavictoria.net.au\\\/?p=26524\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/transmediavictoria.net.au\\\/?p=26524#primaryimage\",\"url\":\"https:\\\/\\\/mma.prnasia.com\\\/media2\\\/2412069\\\/EL100__Hybrid_Electric_Autonomous_Haulage_Truck_in_Shitoumei.jpg?p=medium600\",\"contentUrl\":\"https:\\\/\\\/mma.prnasia.com\\\/media2\\\/2412069\\\/EL100__Hybrid_Electric_Autonomous_Haulage_Truck_in_Shitoumei.jpg?p=medium600\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/transmediavictoria.net.au\\\/?p=26524#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/transmediavictoria.net.au\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"EACON Mining Secures New Contract and Achieves Autonomous Fleet Deployment in 17 Days\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/transmediavictoria.net.au\\\/#website\",\"url\":\"https:\\\/\\\/transmediavictoria.net.au\\\/\",\"name\":\"My Blog\",\"description\":\"My WordPress Blog\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/transmediavictoria.net.au\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/transmediavictoria.net.au\\\/#\\\/schema\\\/person\\\/5b51d407d652c0aa802bea269ea5d7e7\",\"name\":\"admin_tony\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/102836fe5f9cd6c64e96e90e7341dbc815b7d12726a85708326dc0db40afd906?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/102836fe5f9cd6c64e96e90e7341dbc815b7d12726a85708326dc0db40afd906?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/102836fe5f9cd6c64e96e90e7341dbc815b7d12726a85708326dc0db40afd906?s=96&d=mm&r=g\",\"caption\":\"admin_tony\"},\"url\":\"https:\\\/\\\/transmediavictoria.net.au\\\/?author=8\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"EACON Mining Secures New Contract and Achieves Autonomous Fleet Deployment in 17 Days - My Blog","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/transmediavictoria.net.au\/?p=26524","og_locale":"en_US","og_type":"article","og_title":"EACON Mining Secures New Contract and Achieves Autonomous Fleet Deployment in 17 Days - My Blog","og_description":"BEIJING, May 14, 2024 \/PRNewswire\/ &#8212; EACON Mining has once again demonstrated its expertise in the field of opencast coal mining with the 6th &nbsp;AHS contract. The latest project is the Shitoumei coal mine with reserves of 10 billion tons and an annual production capacity of over 15 million tons. Eacon Mining deployed more than [&hellip;]","og_url":"https:\/\/transmediavictoria.net.au\/?p=26524","og_site_name":"My Blog","article_published_time":"2024-05-14T06:44:00+00:00","og_image":[{"url":"https:\/\/mma.prnasia.com\/media2\/2412069\/EL100__Hybrid_Electric_Autonomous_Haulage_Truck_in_Shitoumei.jpg?p=medium600","type":"","width":"","height":""}],"author":"admin_tony","twitter_card":"summary_large_image","twitter_misc":{"Written by":"admin_tony","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/transmediavictoria.net.au\/?p=26524#article","isPartOf":{"@id":"https:\/\/transmediavictoria.net.au\/?p=26524"},"author":{"name":"admin_tony","@id":"https:\/\/transmediavictoria.net.au\/#\/schema\/person\/5b51d407d652c0aa802bea269ea5d7e7"},"headline":"EACON Mining Secures New Contract and Achieves Autonomous Fleet Deployment in 17 Days","datePublished":"2024-05-14T06:44:00+00:00","mainEntityOfPage":{"@id":"https:\/\/transmediavictoria.net.au\/?p=26524"},"wordCount":357,"image":{"@id":"https:\/\/transmediavictoria.net.au\/?p=26524#primaryimage"},"thumbnailUrl":"https:\/\/mma.prnasia.com\/media2\/2412069\/EL100__Hybrid_Electric_Autonomous_Haulage_Truck_in_Shitoumei.jpg?p=medium600","articleSection":["Business News"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/transmediavictoria.net.au\/?p=26524","url":"https:\/\/transmediavictoria.net.au\/?p=26524","name":"EACON Mining Secures New Contract and Achieves Autonomous Fleet Deployment in 17 Days - My Blog","isPartOf":{"@id":"https:\/\/transmediavictoria.net.au\/#website"},"primaryImageOfPage":{"@id":"https:\/\/transmediavictoria.net.au\/?p=26524#primaryimage"},"image":{"@id":"https:\/\/transmediavictoria.net.au\/?p=26524#primaryimage"},"thumbnailUrl":"https:\/\/mma.prnasia.com\/media2\/2412069\/EL100__Hybrid_Electric_Autonomous_Haulage_Truck_in_Shitoumei.jpg?p=medium600","datePublished":"2024-05-14T06:44:00+00:00","author":{"@id":"https:\/\/transmediavictoria.net.au\/#\/schema\/person\/5b51d407d652c0aa802bea269ea5d7e7"},"breadcrumb":{"@id":"https:\/\/transmediavictoria.net.au\/?p=26524#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/transmediavictoria.net.au\/?p=26524"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/transmediavictoria.net.au\/?p=26524#primaryimage","url":"https:\/\/mma.prnasia.com\/media2\/2412069\/EL100__Hybrid_Electric_Autonomous_Haulage_Truck_in_Shitoumei.jpg?p=medium600","contentUrl":"https:\/\/mma.prnasia.com\/media2\/2412069\/EL100__Hybrid_Electric_Autonomous_Haulage_Truck_in_Shitoumei.jpg?p=medium600"},{"@type":"BreadcrumbList","@id":"https:\/\/transmediavictoria.net.au\/?p=26524#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/transmediavictoria.net.au\/"},{"@type":"ListItem","position":2,"name":"EACON Mining Secures New Contract and Achieves Autonomous Fleet Deployment in 17 Days"}]},{"@type":"WebSite","@id":"https:\/\/transmediavictoria.net.au\/#website","url":"https:\/\/transmediavictoria.net.au\/","name":"My Blog","description":"My WordPress Blog","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/transmediavictoria.net.au\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/transmediavictoria.net.au\/#\/schema\/person\/5b51d407d652c0aa802bea269ea5d7e7","name":"admin_tony","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/102836fe5f9cd6c64e96e90e7341dbc815b7d12726a85708326dc0db40afd906?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/102836fe5f9cd6c64e96e90e7341dbc815b7d12726a85708326dc0db40afd906?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/102836fe5f9cd6c64e96e90e7341dbc815b7d12726a85708326dc0db40afd906?s=96&d=mm&r=g","caption":"admin_tony"},"url":"https:\/\/transmediavictoria.net.au\/?author=8"}]}},"_links":{"self":[{"href":"https:\/\/transmediavictoria.net.au\/index.php?rest_route=\/wp\/v2\/posts\/26524","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/transmediavictoria.net.au\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/transmediavictoria.net.au\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/transmediavictoria.net.au\/index.php?rest_route=\/wp\/v2\/users\/8"}],"replies":[{"embeddable":true,"href":"https:\/\/transmediavictoria.net.au\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=26524"}],"version-history":[{"count":0,"href":"https:\/\/transmediavictoria.net.au\/index.php?rest_route=\/wp\/v2\/posts\/26524\/revisions"}],"wp:attachment":[{"href":"https:\/\/transmediavictoria.net.au\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=26524"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/transmediavictoria.net.au\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=26524"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/transmediavictoria.net.au\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=26524"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}