{"id":32269,"date":"2024-12-15T08:38:00","date_gmt":"2024-12-15T08:38:00","guid":{"rendered":"https:\/\/www.prnasia.com\/story\/archive\/4579355_CN79355_0"},"modified":"2024-12-15T08:38:00","modified_gmt":"2024-12-15T08:38:00","slug":"the-worlds-first-660-mw-ultra-supercritical-cfb-power-project-commences-operations","status":"publish","type":"post","link":"https:\/\/transmediavictoria.net.au\/?p=32269","title":{"rendered":"The World&#8217;s First 660 MW Ultra-Supercritical CFB Power Project Commences Operations"},"content":{"rendered":"<p><span class=\"legendSpanClass\">BINCHANG, <span class=\"xn-location\">China<\/span><\/span>, <span class=\"legendSpanClass\"><span class=\"xn-chron\">Dec. 13, 2024<\/span><\/span> \/PRNewswire\/ &#8212; Developed by <a href=\"https:\/\/en.harbin-electric.com\/\" target=\"_blank\" rel=\"nofollow noopener\">Harbin Electric Corporation<\/a>, the world&#8217;s first 660 MW high-efficiency ultra-supercritical circulating fluidized bed (CFB) power generation unit, featuring the highest specifications and largest single-unit capacity, installed in the power plant in Binchang, <span class=\"xn-location\">China<\/span>, has recently successfully completed a 168-hour full-load trial operation test, marking&nbsp;a new global standard in power generation technology.<\/p>\n<div class=\"PRN_ImbeddedAssetReference\" id=\"DivAssetPlaceHolder3006\" readability=\"10\">\n<p><a href=\"https:\/\/mma.prnasia.com\/media2\/2580492\/The_No_1_Generator_Set_Binchang_Project_Shaanxi_China_successfully.html\" target=\"_blank\" rel=\"nofollow noopener\"><img decoding=\"async\" src=\"https:\/\/mma.prnasia.com\/media2\/2580492\/The_No_1_Generator_Set_Binchang_Project_Shaanxi_China_successfully.jpg?p=medium600\" title=\"The No. 1 Generator Set of the Binchang Project in Shaanxi, China, has successfully completed a 168-hour trial operation.\" alt=\"The No. 1 Generator Set of the Binchang Project in Shaanxi, China, has successfully completed a 168-hour trial operation.\"><\/a><br \/><span>The No. 1 Generator Set of the Binchang Project in Shaanxi, China, has successfully completed a 168-hour trial operation.<\/span><\/p>\n<\/p><\/div>\n<p>The Binchang Project, a demonstration initiative endorsed by the Ministry of Science and Technology and the National Energy Administration, stands as a coal industry pacesetter in ecological restoration within the Yellow River Basin. It seamlessly integrates solid waste and mine water utilization with mine geological environment treatment, restoration, and land reclamation.<\/p>\n<p>Planned in two phases, the construction of two units will, upon full operation of the first phase, annually convert approximately 2 million tons of low-calorific value coal and inferior fuels such as coal slime and gangue. It will also utilize 2 million tons of mine water, and supply 6 million GJ of heat, meeting Binzhou City&#8217;s heating needs and local industrial steam demands.<\/p>\n<p>Additionally, the project will enhance regional power grid stability and electricity supply, addressing local power shortages and fostering sustained socio-economic growth.<\/p>\n<div class=\"PRN_ImbeddedAssetReference\" id=\"DivAssetPlaceHolder5294\" readability=\"7\">\n<p><a href=\"https:\/\/mma.prnasia.com\/media2\/2580493\/The_Shaanxi_Binchang_Power_Plant.html\" target=\"_blank\" rel=\"nofollow noopener\"><img decoding=\"async\" src=\"https:\/\/mma.prnasia.com\/media2\/2580493\/The_Shaanxi_Binchang_Power_Plant.jpg?p=medium600\" title=\"The Shaanxi Binchang Power Plant.\" alt=\"The Shaanxi Binchang Power Plant.\"><\/a><br \/><span>The Shaanxi Binchang Power Plant.<\/span><\/p>\n<\/p><\/div>\n<p>Harbin Electric Corporation has engineered the boiler, turbine, and generator, all three core components of the Binchang project. The superior CFB boiler, crafted by Harbin Boiler Company, boasts ultra-low emissions, ultra-high parameters, and ultra-low energy consumption. This fully domestically produced boiler, with its independent intellectual property rights, represents the pinnacle of CFB boiler technology worldwide in terms of parameters and capacity.<\/p>\n<p>The ultra-supercritical indirect air-cooled reverse-flow turbine, a product of Harbin Turbine Company, is another highlight. It is a 660 MW-class turbine featuring a once-through reheat, single-axis, three-cylinder, two-exhaust design. The turbine excels in thermal performance and flow efficiency.<\/p>\n<p>Additionally, the wide-load high-efficiency generator, designed by Harbin Electric Machinery Company, offers high output, exceptional efficiency, low temperature rise, and minimal vibration. It&#8217;s designed for wide-load operation and outstanding performance under challenging conditions, such as deep peak shaving, leading phase operation, and negative-sequence operation.<\/p>\n<div class=\"PRN_ImbeddedAssetReference\" id=\"DivAssetPlaceHolder4350\" readability=\"7\">\n<p><a href=\"https:\/\/mma.prnasia.com\/media2\/2580494\/Steam_Turbine_Generator_Set_Binchang_Project_Shaanxi.html\" target=\"_blank\" rel=\"nofollow noopener\"><img decoding=\"async\" src=\"https:\/\/mma.prnasia.com\/media2\/2580494\/Steam_Turbine_Generator_Set_Binchang_Project_Shaanxi.jpg?p=medium600\" title=\"Steam Turbine Generator Set for the Binchang Project in Shaanxi.\" alt=\"Steam Turbine Generator Set for the Binchang Project in Shaanxi.\"><\/a><br \/><span>Steam Turbine Generator Set for the Binchang Project in Shaanxi.<\/span><\/p>\n<\/p><\/div>\n<p>The ultra-supercritical CFB power generation technology marks a significant breakthrough under <span class=\"xn-location\">China&#8217;s<\/span> 13th Five-Year Plan. It advances high-parameter, large-capacity, and energy-efficient CFB technology, aligning with the nation&#8217;s new-era energy development objectives. This resonates with Harbin Electric Corporation&#8217;s dedication to developing new competitive advantages in sustainable, low-carbon energy technologies, and driving the creation of new productive forces to meet the challenges of the evolving energy landscape.<\/p>\n<p>Harbin Electric Corporation utilized resources from <span class=\"xn-location\">China&#8217;s<\/span> 13th Five-Year Plan to enter into partnerships with <span class=\"xn-location\">China&#8217;s<\/span> top universities, including Tsinghua, Xi&#8217;an Jiaotong, <span class=\"xn-location\">Zhejiang<\/span>, and <span class=\"xn-location\">Chongqing<\/span>.<\/p>\n<p>Through the integration of advanced technology and practical engineering, they addressed key challenges to engineer ultra-high-parameter, ultra-large CFB boiler equipment, successfully scaling up to 660 MW capacity. The boiler&#8217;s main steam pressure peaks at 29.3 MPa, equivalent to the weight of four adults standing on a nail-sized section of pipe. With a main steam temperature of 605\u00b0C and a reheat steam temperature of 623\u00b0C, it sets new international standards for CFB boiler parameters. The boiler also achieves a 95% desulfurization efficiency, enabling ultra-low emissions for large-scale CFB applications.<\/p>\n<p>Harbin Electric Corporation&#8217;s commitment to excellence has driven the Binchang project from proposal evaluation to national demonstration status under the 13th Five-Year Plan. The success of each phase, from construction and hydrostatic testing to grid connection, and commissioning, has culminated in a world-class power generation facility, boasting unprecedented parameters and performance. The successful operation of the 660 MW ultra-supercritical CFB boiler not only fills a significant gap in global technology but also cements Harbin Electric Corporation&#8217;s pioneering role in large-capacity, high-parameter CFB technology. This milestone heralds a new era of ultra-supercritical parameters for CFB boilers worldwide.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>BINCHANG, China, Dec. 13, 2024 \/PRNewswire\/ &#8212; Developed by Harbin Electric Corporation, the world&#8217;s first 660 MW high-efficiency ultra-supercritical circulating fluidized bed (CFB) power generation unit, featuring the highest specifications and largest single-unit capacity, installed in the power plant in Binchang, China, has recently successfully completed a 168-hour full-load trial operation test, marking&nbsp;a new global [&hellip;]<\/p>\n","protected":false},"author":8,"featured_media":32270,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[20],"tags":[],"class_list":["post-32269","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-business-news"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.9 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>The World&#039;s First 660 MW Ultra-Supercritical CFB Power Project Commences Operations - My Blog<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/transmediavictoria.net.au\/?p=32269\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"The World&#039;s First 660 MW Ultra-Supercritical CFB Power Project Commences Operations - My Blog\" \/>\n<meta property=\"og:description\" content=\"BINCHANG, China, Dec. 13, 2024 \/PRNewswire\/ &#8212; Developed by Harbin Electric Corporation, the world&#8217;s first 660 MW high-efficiency ultra-supercritical circulating fluidized bed (CFB) power generation unit, featuring the highest specifications and largest single-unit capacity, installed in the power plant in Binchang, China, has recently successfully completed a 168-hour full-load trial operation test, marking&nbsp;a new global [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/transmediavictoria.net.au\/?p=32269\" \/>\n<meta property=\"og:site_name\" content=\"My Blog\" \/>\n<meta property=\"article:published_time\" content=\"2024-12-15T08:38:00+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/mma.prnasia.com\/media2\/2580492\/The_No_1_Generator_Set_Binchang_Project_Shaanxi_China_successfully.jpg?p=medium600\" \/>\n<meta name=\"author\" content=\"admin_tony\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"admin_tony\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"3 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/transmediavictoria.net.au\\\/?p=32269#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/transmediavictoria.net.au\\\/?p=32269\"},\"author\":{\"name\":\"admin_tony\",\"@id\":\"https:\\\/\\\/transmediavictoria.net.au\\\/#\\\/schema\\\/person\\\/5b51d407d652c0aa802bea269ea5d7e7\"},\"headline\":\"The World&#8217;s First 660 MW Ultra-Supercritical CFB Power Project Commences Operations\",\"datePublished\":\"2024-12-15T08:38:00+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/transmediavictoria.net.au\\\/?p=32269\"},\"wordCount\":646,\"image\":{\"@id\":\"https:\\\/\\\/transmediavictoria.net.au\\\/?p=32269#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/transmediavictoria.net.au\\\/wp-content\\\/uploads\\\/2024\\\/12\\\/the-worlds-first-660-mw-ultra-supercritical-cfb-power-project-commences-operations.jpg\",\"articleSection\":[\"Business News\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/transmediavictoria.net.au\\\/?p=32269\",\"url\":\"https:\\\/\\\/transmediavictoria.net.au\\\/?p=32269\",\"name\":\"The World's First 660 MW Ultra-Supercritical CFB Power Project Commences Operations - My Blog\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/transmediavictoria.net.au\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/transmediavictoria.net.au\\\/?p=32269#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/transmediavictoria.net.au\\\/?p=32269#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/transmediavictoria.net.au\\\/wp-content\\\/uploads\\\/2024\\\/12\\\/the-worlds-first-660-mw-ultra-supercritical-cfb-power-project-commences-operations.jpg\",\"datePublished\":\"2024-12-15T08:38:00+00:00\",\"author\":{\"@id\":\"https:\\\/\\\/transmediavictoria.net.au\\\/#\\\/schema\\\/person\\\/5b51d407d652c0aa802bea269ea5d7e7\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/transmediavictoria.net.au\\\/?p=32269#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/transmediavictoria.net.au\\\/?p=32269\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/transmediavictoria.net.au\\\/?p=32269#primaryimage\",\"url\":\"https:\\\/\\\/transmediavictoria.net.au\\\/wp-content\\\/uploads\\\/2024\\\/12\\\/the-worlds-first-660-mw-ultra-supercritical-cfb-power-project-commences-operations.jpg\",\"contentUrl\":\"https:\\\/\\\/transmediavictoria.net.au\\\/wp-content\\\/uploads\\\/2024\\\/12\\\/the-worlds-first-660-mw-ultra-supercritical-cfb-power-project-commences-operations.jpg\",\"width\":600,\"height\":426},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/transmediavictoria.net.au\\\/?p=32269#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/transmediavictoria.net.au\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"The World&#8217;s First 660 MW Ultra-Supercritical CFB Power Project Commences Operations\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/transmediavictoria.net.au\\\/#website\",\"url\":\"https:\\\/\\\/transmediavictoria.net.au\\\/\",\"name\":\"My Blog\",\"description\":\"My WordPress Blog\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/transmediavictoria.net.au\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/transmediavictoria.net.au\\\/#\\\/schema\\\/person\\\/5b51d407d652c0aa802bea269ea5d7e7\",\"name\":\"admin_tony\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/102836fe5f9cd6c64e96e90e7341dbc815b7d12726a85708326dc0db40afd906?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/102836fe5f9cd6c64e96e90e7341dbc815b7d12726a85708326dc0db40afd906?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/102836fe5f9cd6c64e96e90e7341dbc815b7d12726a85708326dc0db40afd906?s=96&d=mm&r=g\",\"caption\":\"admin_tony\"},\"url\":\"https:\\\/\\\/transmediavictoria.net.au\\\/?author=8\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"The World's First 660 MW Ultra-Supercritical CFB Power Project Commences Operations - My Blog","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/transmediavictoria.net.au\/?p=32269","og_locale":"en_US","og_type":"article","og_title":"The World's First 660 MW Ultra-Supercritical CFB Power Project Commences Operations - My Blog","og_description":"BINCHANG, China, Dec. 13, 2024 \/PRNewswire\/ &#8212; Developed by Harbin Electric Corporation, the world&#8217;s first 660 MW high-efficiency ultra-supercritical circulating fluidized bed (CFB) power generation unit, featuring the highest specifications and largest single-unit capacity, installed in the power plant in Binchang, China, has recently successfully completed a 168-hour full-load trial operation test, marking&nbsp;a new global [&hellip;]","og_url":"https:\/\/transmediavictoria.net.au\/?p=32269","og_site_name":"My Blog","article_published_time":"2024-12-15T08:38:00+00:00","og_image":[{"url":"https:\/\/mma.prnasia.com\/media2\/2580492\/The_No_1_Generator_Set_Binchang_Project_Shaanxi_China_successfully.jpg?p=medium600","type":"","width":"","height":""}],"author":"admin_tony","twitter_card":"summary_large_image","twitter_misc":{"Written by":"admin_tony","Est. reading time":"3 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/transmediavictoria.net.au\/?p=32269#article","isPartOf":{"@id":"https:\/\/transmediavictoria.net.au\/?p=32269"},"author":{"name":"admin_tony","@id":"https:\/\/transmediavictoria.net.au\/#\/schema\/person\/5b51d407d652c0aa802bea269ea5d7e7"},"headline":"The World&#8217;s First 660 MW Ultra-Supercritical CFB Power Project Commences Operations","datePublished":"2024-12-15T08:38:00+00:00","mainEntityOfPage":{"@id":"https:\/\/transmediavictoria.net.au\/?p=32269"},"wordCount":646,"image":{"@id":"https:\/\/transmediavictoria.net.au\/?p=32269#primaryimage"},"thumbnailUrl":"https:\/\/transmediavictoria.net.au\/wp-content\/uploads\/2024\/12\/the-worlds-first-660-mw-ultra-supercritical-cfb-power-project-commences-operations.jpg","articleSection":["Business News"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/transmediavictoria.net.au\/?p=32269","url":"https:\/\/transmediavictoria.net.au\/?p=32269","name":"The World's First 660 MW Ultra-Supercritical CFB Power Project Commences Operations - My Blog","isPartOf":{"@id":"https:\/\/transmediavictoria.net.au\/#website"},"primaryImageOfPage":{"@id":"https:\/\/transmediavictoria.net.au\/?p=32269#primaryimage"},"image":{"@id":"https:\/\/transmediavictoria.net.au\/?p=32269#primaryimage"},"thumbnailUrl":"https:\/\/transmediavictoria.net.au\/wp-content\/uploads\/2024\/12\/the-worlds-first-660-mw-ultra-supercritical-cfb-power-project-commences-operations.jpg","datePublished":"2024-12-15T08:38:00+00:00","author":{"@id":"https:\/\/transmediavictoria.net.au\/#\/schema\/person\/5b51d407d652c0aa802bea269ea5d7e7"},"breadcrumb":{"@id":"https:\/\/transmediavictoria.net.au\/?p=32269#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/transmediavictoria.net.au\/?p=32269"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/transmediavictoria.net.au\/?p=32269#primaryimage","url":"https:\/\/transmediavictoria.net.au\/wp-content\/uploads\/2024\/12\/the-worlds-first-660-mw-ultra-supercritical-cfb-power-project-commences-operations.jpg","contentUrl":"https:\/\/transmediavictoria.net.au\/wp-content\/uploads\/2024\/12\/the-worlds-first-660-mw-ultra-supercritical-cfb-power-project-commences-operations.jpg","width":600,"height":426},{"@type":"BreadcrumbList","@id":"https:\/\/transmediavictoria.net.au\/?p=32269#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/transmediavictoria.net.au\/"},{"@type":"ListItem","position":2,"name":"The World&#8217;s First 660 MW Ultra-Supercritical CFB Power Project Commences Operations"}]},{"@type":"WebSite","@id":"https:\/\/transmediavictoria.net.au\/#website","url":"https:\/\/transmediavictoria.net.au\/","name":"My Blog","description":"My WordPress Blog","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/transmediavictoria.net.au\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/transmediavictoria.net.au\/#\/schema\/person\/5b51d407d652c0aa802bea269ea5d7e7","name":"admin_tony","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/102836fe5f9cd6c64e96e90e7341dbc815b7d12726a85708326dc0db40afd906?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/102836fe5f9cd6c64e96e90e7341dbc815b7d12726a85708326dc0db40afd906?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/102836fe5f9cd6c64e96e90e7341dbc815b7d12726a85708326dc0db40afd906?s=96&d=mm&r=g","caption":"admin_tony"},"url":"https:\/\/transmediavictoria.net.au\/?author=8"}]}},"_links":{"self":[{"href":"https:\/\/transmediavictoria.net.au\/index.php?rest_route=\/wp\/v2\/posts\/32269","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/transmediavictoria.net.au\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/transmediavictoria.net.au\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/transmediavictoria.net.au\/index.php?rest_route=\/wp\/v2\/users\/8"}],"replies":[{"embeddable":true,"href":"https:\/\/transmediavictoria.net.au\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=32269"}],"version-history":[{"count":0,"href":"https:\/\/transmediavictoria.net.au\/index.php?rest_route=\/wp\/v2\/posts\/32269\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/transmediavictoria.net.au\/index.php?rest_route=\/wp\/v2\/media\/32270"}],"wp:attachment":[{"href":"https:\/\/transmediavictoria.net.au\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=32269"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/transmediavictoria.net.au\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=32269"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/transmediavictoria.net.au\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=32269"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}